Skip to main content

Online Store

T&R Report R-28: Maritime Energy Research And Development (1983)

T&R Report R-28: Maritime Energy Research And Development (1983)

Available
Rating: 0 out of 5
  • 1
  • 2
  • 3
  • 4
  • 5
No Reviews
Quick Overview:

With the energy element of vessel operating costs outstripping both the escalation rates and absolute values of nearly all other primary ship-connected expenses, little more needs to be said to un ...

Price:

$40.00 - T&R Report R-28: Maritime Energy Research And Development (1983)- list price

$20.00 - T&R Report R-28: Maritime Energy Research And Development (1983) - student member price

$20.00 - T&R Report R-28: Maritime Energy Research And Development (1983) - member price

Number of pages:25
Year published:1983
Share it:
Description
With the energy element of vessel operating costs outstripping both the escalation rates and absolute values of nearly all other primary ship-connected expenses, little more needs to be said to underscore the importance of a comprehensive review of the maritime energy research problem. The urgency of energy conservation research has been diminished somewhat by current fluctuations in crude oil prices and availability, but long term trends continue to support the need, SNAME's T&R program has addressed a number of ways in which energy expenditure might be reduced. These include basic hull and propeller design, machinery component and cycle design, hull coatings, ship operations, the use of primary fuels, and alternative fuels and non-current sources of energy.
 
This report presents the Society's current assessment of ongoing and potentially useful programs. Although the emphasis is placed on programs expected to yield results applicable within a five-year period at most, a number of longer-term projects also are noted. The short term projects are recommended for review by appropriate panels of the T&R organization's Technical Committees and Panels in formulating their technical and research programs over the next several years. The longer-term projects are recommended both to the Technical Committees and Panels for the out years, and to the Advance Planning Committee for monitoring, as to continued need and ultimate action by the Technical Committees.
Add to Cart
40.00
Required
We're sorry, but there is no inventory for the product you selected. Check out these other great products:

Related Products

    Other Purchased Products

      Reviews

      No records found.